LUMINA-30 practical boundary-review document

NO / UNKNOWN Boundary Gap Response Sheet

This sheet provides a minimum record format for preventing a NO or UNKNOWN finding in a pre-boundary review from being left unresolved.

Version: v0.1
Scope: Practical Boundary Review Add-on for LUMINA-30 pre-boundary review
Status: Current public working edition

Purpose

This sheet provides a minimum record format for preventing a NO or UNKNOWN finding in a pre-boundary review from being left unresolved.

It is designed to avoid the pattern where a boundary problem is identified but no operational action follows. It connects gaps in authority, evidence, and stopping procedures to interim measures and review deadlines before irreversibility occurs.

This sheet is not a safety guarantee, certification, legal compliance finding, or replacement for existing AI governance procedures.

When to use this sheet

Use this sheet when any of the following applies.

Anti-tokenization rule

If NO or UNKNOWN is found, do not close the review by writing only “check before next time.”

The record must include all three items below.

  1. Interim measure
  2. Responsible owner
  3. Review deadline

Boundary Gap Response Sheet

Target process:
Review date:
Original classification: NO / UNKNOWN
Recorded by:

1. Authority gap
Who should have authority to stop the process:
Who currently has authority to stop the process:
If no one has that authority, why not:
Could the authority arrive too late to stop irreversibility: yes / no / unknown
Notes:

2. Evidence gap
Documents, logs, settings, or procedures showing the authority exists: yes / no / unknown
Evidence reviewed:
Missing evidence:
Owner for evidence confirmation:

3. Interim measure (select at least one)
[ ] Hold deployment
[ ] Continue with conditions
[ ] Request design change

Description of interim measure:
If continuing with conditions, conditions that prevent entry into irreversible operation:
If requesting design change, required changes:

4. Next action and owner
Who:
What:
By when:
Completion condition:

5. Review deadline and approving authority
Review deadline: YYYY-MM-DD
Person or role responsible for review:
Person or role approving the interim measure:

6. Follow-up result
Follow-up review date:
Result: YES / NO / UNKNOWN / Continued response
Reason:
Next action:

How to choose an interim measure

Interim measure When to use it Minimum requirement
Hold deployment A human cannot stop the process before the irreversible operation, or no stop authority exists. State that the process must not proceed to the irreversible operation.
Continue with conditions Investigation, validation, or limited testing can continue without entering the irreversible operation. State the allowed scope, prohibited operations, deadline, and responsible owner.
Request design change A human decision point, stopping mechanism, authority, or evidence record can be added and then re-reviewed. State the required change and review deadline.

Closure condition

Do not treat this sheet as closed until one of the following is recorded.

Note

NO or UNKNOWN is not a record of failure. It is an operational warning that the process may not be stoppable before irreversibility.